The job sold clean.
It leaks on the way to done.
Between sold and done, reno jobs bleed time and margin — overloaded crews, a schedule that lives in three places, change orders that never got signed, finished work that goes quiet. This checklist names the strain point costing you the most.
2 minutes. No login. One strain zone, named — with what to tighten first.
Reno Ops Checklist
Find where your renovation operation loses time, margin, and momentum between sold and done.
One question at a time. No generic score. The result stays locked until operator details are entered.
One strain zone, named — with what to tighten first.
What the checklist reveals
Eight questions test five places a reno operation loses time and margin between sold and done. The worst-scoring zone becomes your diagnosis — no checklist to print, no generic advice.
- Capacity
Crew + sub load
Whether sold work is outrunning the crews and trades that have to deliver it.
- Schedule
Scheduling drift
Whether the build lives on one shared schedule — or in texts, notes, and memory.
- Scope
Change orders
Whether extra scope is signed and billed before work, or quietly eaten as cost.
- Close-out
Client follow-up
Whether finished jobs turn into reviews, referrals, and repeat work — or just end.
- Margin
Job costing
Whether real margin is visible during the job, or discovered after the money is gone.