Reno Ops Checklist · 8 questions

The job sold clean.
It leaks on the way to done.

Between sold and done, reno jobs bleed time and margin — overloaded crews, a schedule that lives in three places, change orders that never got signed, finished work that goes quiet. This checklist names the strain point costing you the most.

2 minutes. No login. One strain zone, named — with what to tighten first.

0/8 diagnostic inputs
DM RENOCanada + USAOperating diagnostic

Reno Ops Checklist

Find where your renovation operation loses time, margin, and momentum between sold and done.

00

One question at a time. No generic score. The result stays locked until operator details are entered.

> sold ──▸ donestrain found
Crew + sub loadon track
Scheduling driftdrifting
Change ordersstrain
Client follow-upon track
Job costingdrifting

One strain zone, named — with what to tighten first.

What the checklist reveals

Eight questions test five places a reno operation loses time and margin between sold and done. The worst-scoring zone becomes your diagnosis — no checklist to print, no generic advice.

  • Capacity

    Crew + sub load

    Whether sold work is outrunning the crews and trades that have to deliver it.

  • Schedule

    Scheduling drift

    Whether the build lives on one shared schedule — or in texts, notes, and memory.

  • Scope

    Change orders

    Whether extra scope is signed and billed before work, or quietly eaten as cost.

  • Close-out

    Client follow-up

    Whether finished jobs turn into reviews, referrals, and repeat work — or just end.

  • Margin

    Job costing

    Whether real margin is visible during the job, or discovered after the money is gone.